Wednesday, May 6, 2020
African Americans During The Reconstruction Era - 1629 Words
During The Reconstruction era, African Americans faced many obstacles on their way to success. Reconstruction of the United States refers to the remodeling that took place after the civil war. The country was injured in all areas. Its society, economy and physical structure had been In January of 1863; President Abraham Lincoln lifted the chains off thousands of African Americansââ¬â¢ shoulders by releasing the Emancipation Proclamation. Unfortunately, this relief was short-winded. The Emancipation Proclamation stated that all people who were deemed as slaves, were to be set free from slavery and guaranteed to no return to it. At first glance, this new legislative act appeared to provide endless opportunities for newly freed African Americans. Instead, life after the passing of the Emancipation Proclamation conceived more problems for African Americans than those they possessed during the bondage of slavery. After the Emancipation Proclamation was passed, African Americans faced various issues including a lack of opportunities, an unfair starting point and continuous discrimination. A dominant downfall to the Emancipation Proclamation was the small amount of opportunities that were available for African American workers. Though the law allowed African Americans to join the work force, it did not create jobs for them to obtain. This led these newly freed men to resort to the same type of labor they performed before gaining freedom. Most African American men returned to hardShow MoreRelatedThe End Of The Reconstruction1318 Words à |à 6 Pages1860ââ¬â¢s there was an Era that started called the reconstruction. The main purpose for the reconstruction was to give African-American people full political and civil equality. However, it was very tough to do this, especially since most white in the south didnââ¬â¢t want the African-Americans to have the same rights as themselves. During this Era there were multiple good things that happened, yet, there were a lso many bad things that happened. For instance, during the reconstruction the 14th amendmentRead MoreThe Reconstruction Era Was A Success1490 Words à |à 6 PagesThe Reconstruction Era was a Success Shortly after the Civil War ended in 1867, President Abraham Lincolnââ¬â¢s new objective was to unify the union and the confederate states into what was formerly known as the United States of America. This time period is known as the Reconstruction Era, starting with the surrender of Robert E. Lee at Appomattox Court House in 1865 and ending with the implementation of the Compromise of 1877. The Reconstruction Era was a time period full of political, economicRead MoreReconstruction Of The Reconstruction Era1587 Words à |à 7 PagesThe Reconstruction Era was known as a time to reconstruct the United States of America by the expansion of governmental power that began in 1865. ââ¬Å"There were two central problems that animated Reconstruction; providing justice for freedmen and facilitating national reconciliation. (A New Birth of Freedom, pg. 1) After the 12 year span, reconstructing the nation succeeded in only a few of the goals that were set out to achieve within those 12 years that it was in progress. The Reconstructionââ¬â¢s intentionsRead MoreReconstruction Era1650 Words à |à 7 PagesReconstruction 1 The Reconstruction Era Jessica Onken American History Since 1865 Professor Tim Johnston August 2, 2010 Reconstruction 2 The Reconstruction Era The reconstruction era was a difficult time for the African American slaves from 1865 to 1877 because the slaves were freed and there were no jobs for them, had very little or no education, and had very limited opportunity in the south. Reconstruction was one of the most critical periods in American History. The CivilRead MoreThe Reconstruction-Era Essay731 Words à |à 3 PagesThe Reconstruction-Era The Reconstruction-era offered numerous opportunities to African-Americans, by attempting to secure the rights for ex-slaves, but the opportunities presented even more obstacles to them. The thought of freedom intrigued the African-Americans at first, but many of them quickly changed their minds after experiencing it. Henry William Ravenel, a slaveowner, proclaimed, When they were told they were free, some said they did not wish to be freeRead MoreAnalysis of The Reconstruction Period1087 Words à |à 5 Pagesthese African Americans and the Southââ¬â¢s ever-growing hatred towards this group, African Americans were left to suffer harsh discrimination and horrible conditions. Africans Americans were left without homes, education, jobs, or money. Reconstruction was the Radical Republicansââ¬â¢ attempt to try and bring the Confederate states back to normal and unite both the South and the North into a whole country once again. Reconstruction was also set to protect and help th e newly freed African Americans assimilateRead MoreThe Reconstruction Era During The Civil War910 Words à |à 4 Pagesone time African Americans were treated poorly this country wouldnââ¬â¢t be what it is today without what African Americans went through. They have had such a major impact on music, movies, literature, sports, and many other things. The Reconstruction Era took place after the end of the Civil War. It lasted from 1965 to 1977. It was the Northââ¬â¢s way of making peace with not only former slaves, but the South as well. The Reconstruction Era attempted to better the lives of African Americans by makingRead MoreThe Legacy Of The Civil War Essay1593 Words à |à 7 Pagespain. Veteran William Lloyd Garrison describes few of many changes that occurred after the Civil War, including the abolishment of slavery and the African American being granted for the first time in history the right to vote. As the civil war came to an end, the United States began to establish an undivided nation. This era known as the reconstruction era is described as ââ¬Å"meaning literally the rebuilding of a shattered nation. (verterans of the civil movment, n.d.) Reconstructionââ¬â¢s main goal was toRead MoreCivil Reconstruction And Its Impact On The Civil War977 Words à |à 4 PagesDuring the early 1900ââ¬â¢s, slavery had already been abolished. African-Americans were freed and could earn a decent life for themselves; this did not mean they would live a peaceful life. After slavery ended, Reconstruction was introduced to bring the former Confederate states back into the union . As reconstruction was getting started, Radical Republicans of the North passed the Military Rec onstruction Acts of 1867 for revenge on the southerners, which divided the south into five military districtsRead MoreReconstruction Of Reconstruction During The Civil War883 Words à |à 4 Pages Describe and analyze Reconstruction. Did Reconstruction have any successes? The end of civil war in the United States of America brought about many problems, in particular for the South. Some of the problems were political, economic decay and social disorder. The war destroyed the plantations and crops thus causing many to starve to death while others became homeless. The reconstruction became the only hope for the people. Radical reconstruction began in 1867, which enabled the freed black men
Tuesday, May 5, 2020
Condition On Reaction Organizational Change -Myassignmenthelp.Com
Question: Discuss About The Condition On Reaction Organizational Change? Answer: Introduction Apple is one of the monster company in the field of the technological industry and it is important to adapt changes as per the need of the time in manner to fulfil the needs and requirements of its consumers. Recently, leadership has been changed in the Apple and that is a type of change that has helped in better managing the operational activity of the Apple. The purpose of this report is to present context related to the change management in the Apple and provide the aspects related to the change implementation within the existing system of the organization. Project Sponsor He or she is generally an executive within the organization, who is responsible for enforcing the decisions and resource allocations related to the constraints of the Apple. He or she is a stakeholder who must be included within the all phases of the project or change in manner to get approval on the decisions and discuss the changes those are about to be made. Project Objectives The objective of this report is to present all the aspects related to the change and change management within the existing system of the organization and relating these aspects with the chosen company that is Apple. The other objective of this change management plan is to discuss the change plan elements, its rationale, to present a stakeholder analysis, and thus develop a feasible change plan within the organization. Change Objectives and Principles The transformational and transitional change processes will be including the steps that includes raising the team member and submitting the Change Request Form to the change manager who will be handling the project. Evaluate the changes those have been requested for the transformation within the existing system of the organization. Updating the CR log relating the changes and the status of the change those have been updated throughout the CR process. Assessing the recommended the change working, solution, approval of the change request, or rejection of the proposed change that is not suitable. The principle underlying the change management plan will be to provide suitable and better platform for the employees to lead the operational activities and targeted customer in more effective and efficient manner. There would be certain ethical issues in this change processes such as employees might not like new leader might not be appreciated by the employees or his or her order might not be listened by the employees. Change Plan Elements The main elements of the change management will be the internal stakeholder including the employees, and the heads as new head will be introduced and thus, the higher power and leadership will be transformed. This will also affect the skills and processes within the existing system of the organization as every leader has its own style to make the employees work towards the objectives and goals of the organization. He or she would might try to change some of the existing processes and try to implement or impose new processes, which are not acceptable to the old employees. The overall focus of the change management plan would be to ensure that the elements will be considered in positive manner and respective transformation will be implemented within the organizational structure. The skills will be enhanced if the new leader managed to learn about the specification and qualification of the individual employees and assign respective roles to them. These elements could affect the organiza tion and skills of the employees in positive or negative manner as per the will of the leader. Rationale for the Change The team of heads who are responsible of taking hard decisions related to the leadership and management will be playing the role of the driver as they are responsible for selecting the new leader and thus, his decisions and actions will be affecting the whole decisions and actions of the employees. Introducing new leader will have many objectives related to the development and enhancement of the organization however, the major constraint of this change will be enhance the overall performance of the organization. The constraint of the project after new leadership would lie under maintaining better communication, motivating employees, ensuring their respective place within the organization, describing he employees as the part of the organization and many more. The overall output of this change would help the organization in enhancing the individual performance of the employees and thus, in return will be helpful in enhancing the overall performance of the organizations output and reven ue. Motivating employees in either way will affect the organizations performance on the basis of meeting the needs and requirements of the consumers and the financial output of the Apple. Key Stakeholder Analysis The key stakeholders will be the employees of the organization, sponsors, business partners, executive managers and heads. This will also include the consumers, technology lover people, targeted customers, countries economy utilizing apple products and other consumers. This change management will affect all the identified stakeholders in positive manner and every stakeholder will have certain roles and responsibilities in this change. The primary concern for the heads and the executive managers would be that the new leader is capable of executing the needed requirements of the organization and will contribute in fulfilling the needs and requirements of the consumers and manage the other stakeholders in effective and efficient manner. The consumers will be consuming the products and services offered by Apple and the quality if the offered products and services will be according to the needs of the consumers, the change will find to be efficient and effective. Thus, the other stakehold ers will similarly be affected by the proposed change and most responsible sector will be employees as they will be forced to work under new leader without knowing the intention and activities of the new leader. It is important to have a better and effective communication between the stakeholders in manner to identify the needs and requirements of the stakeholders and fulfilling their need. The primary concern should be providing the innovative and new products or services to the consumers and provide them better services than it was earlier before the change implementation. The change should not be only imposed on the employees and staffs of the organization rather it should be made sure that the stakeholders who are being affected by the change is well known with the established and assumptions made about the change that is about to be implemented within the Apple. Arranging meeting with the employees and informing them about the effective change would be an effective way for the communication between them. Assessment of Readiness to Change There would not be a supportive expression from the executives of the Apple on changing the lead as most of the chef executives would want to take over the leadership and manage the operational activities in their way. This strategy will of high level in manner to ensure the effective and efficient implementation of the change and manage it properly within the context of the development of the organization. This is a framework that will help in making this implementation an effective and efficient change management within the existing structure and working system of the organization. The employees support will be primary factor for the successful implementation of the change and thus, their positive response will be helpful in managing the internal activities within the organization. The innovation and new services or products should be acceptable by the consumers should be according to the requirements and needs of the consumers and thus, should be loved and liked by them in manner to make it trending in the market. Strong senior employees might resist the new change implementation and thus, this resonance will affect the organization in negative manner. Key Change Messages For the complete implementation of the change management plan there needs to be the consideration of the messages that are to be forwarded to the higher authorities of the company. The following list can be considered to be the 6 key informative messages regarding the initiation of the change in the organisation: The key stakeholders of the company needs to assess the change management plan before it is executed in the company. The change management plan should be able to comply with the objectives of the company. The objectives of the company needs to be assessed for the determination of the proper method for the implementation of the change management plan for the company. The main concern regarding the execution of the change management plan of the company needs to be addressed in the change management plan. The changed should be able to bring a positive change in the company. Negative changes should be considered only if it can benefit the company in one way or the other. If there is loss in the process of implementation of the change management plan then there needs to be inclusion of the required details about the work in the system. The above 6 key messages needs to be kept in mind during the implementation of the change management plan. The key elements needs to be implemented in the process of development of the change management plan. The elements needs to be assessed properly for the making of the change management plan. Identify Change Elements The elements of the company can be described as the essential building blocks of the company. The collection and the proper working of the company are essential for the proper working of the company. The major elements where the change needs to be implemented in the company are as follows: Stakeholders: The stakeholders of the company can be said to be one of the primary financial element in the company. They hold a stake in the company for exchange for a sum of money to the company. The stakeholders may often tend to get hyper due to the rise in the working pressure of the company. This would result in the rise for the amount of money that needs to be invested into the company by them. It can be often beneficial for the company to change the number of stakeholders of their company. This would provide others to invest in the company and also have a rotational financial income for the company. Specialist: The working specialist group of the company should be worked in rotational work for the betterment of the company. They should be changed every five years in order to make the work better in the company. New faces in the company would work double the effort of the older employees which helps in the growth of the company. Leadership: Apart from all the works in the company, the management of the company can be considered to be one of the most important work for the completion of the work in the company. This causes the change in the form of leadership in the company. The change in the leadership can be beneficial for the company in the form of new innovative ideas and works for the company. Change in leadership has always been a welcome sign in the company. The democracy of a country works in the same way with the implementation of the change in the leadership form. Resources: The collection of different resources are the optimal working process for the progress of the company. Thus the use of fresh supply of resources for the company should be welcomed as a change in the company. If it is seen that the workers of the consolidated who provide the resources to the company are not providing the high grade products then it would be beneficial for the company to change their resource collection companies. The above points cannot all be implemented at the same time. However it should be considered that there is a positive impact process and a negative impact process for the process in the company. Thus it needs to be considered before the implementation of the above processes before they are implemented into the company. Develop Change Plan For the implementation of the change management plan with the help of the following process: Sl. No. Action Who When Performance Measures 1 Discussion Manager, stakeholders to understand the process to be changed 2 Development Manager After 1 to produce the work for the change process 3 Writing Manager, Writer After 2 to write the plan for execution 4 Execution Manager After 3 to execute the work for the change management plan 5 Feedback Manager After 4 to collect the feedback for the from the managers and the employees 6 Revision Manager After 5 to revise the plan based on the feedback collected 7 Finalization Manager After 6 to finalize the change plan for the company Consolidation For the completion of the change management plan for the change there needs to the process of the completion of the policies and the execution of the plan in a proper manner. The policies and the performance of the project plan needs to be emphasised as per the change plan that has to be developed. The removal of the barriers regarding the change system in the organisation needs to be used for the execution of the plan. The correct process would be to use the system process of the objective set out for the project for the completion of the project. Reinforcement of the changes needs to be done so that the company would be able to evaluate the changes required for the betterment of the company. Evaluation The evaluation of the change plan process needs to be related to the achievement of the change management plan for the company. The planned objective of the company needs to be understood and then studied for the development of the change management plan. The discussion with the management and the stakeholders of the company needs to be done upon which the decision needs to be taken for the completion of the plan. The development would then be started based on the discussion completed for the plan. The change plan is written in a report form to be reviewed and executed in the company. After the step the plan can be executed in the company. The execution cannot be completed all at once. Step by step evaluation needs to be done on the project. The completion of the evaluation process would require time which can be used for the collection of the feedback based on the steps completed. Based on the feedback the plan needs to be revised and then the final execution needs to be executed. T he plan of the process can then be executed as per the requirement of the objectives of the company References Al-Haddad, S., Kotnour, T. (2015). Integrating the organizational change literature: a model for successful change. Journal of Organizational Change Management, 28(2), 234262. https://doi.org/10.1108/JOCM-11-2013-0215 Andre, J. M. (2013). Plan Do Stablise Repeat: How to lead change successfully. (cover story). Management Services, 57(1), 4247. Retrieved from https://search.ebscohost.com/login.aspx?direct=trueAuthType=url,ip,cookie,uiddb=bchAN=87021016site=ehost-live Badia, G. (2015). Calling all academic librarians to lead!: Developing and using inside talent to stay ahead. Library Leadership and Management, 30(1), 19. Retrieved from https://www.scopus.com/inward/record.url?eid=2-s2.0-84946595164partnerID=tZOtx3y1 Bergstrm, J., Miller, M., Horneij, E. (2015). Work environment perceptions following relocation to open-plan offices: A twelve-month longitudinal study. Work, 50(2), 221228. https://doi.org/10.3233/WOR-131798 Blviken, T., Aslesen, S., Koskela, L. (2015). What Is a Good Plan? 23rd Annual Conference of the International Group for Lean Construction, 93102. Retrieved from https://www.iglc.net/papers/details/1238 DellaSala, D. A., Baker, R., Heiken, D., Frissell, C. A., Karr, J. R., Kim Nelson, S., Strittholt, J. (2015). Building on two decades of ecosystem management and biodiversity conservation under the Northwest Forest Plan, USA. Forests. https://doi.org/10.3390/f6093326 Donnelly, P., Kirk, P. (2015). Use the PDSA model for effective change management. Education for Primary Care. https://doi.org/10.1080/14739879.2015.11494356 Eagles, P. F. J., Coburn, J., Swartman, B. (2014). Plan quality and plan detail of visitor and tourism policies in Ontario Provincial Park management plans. Journal of Outdoor Recreation and Tourism, 78, 4454. https://doi.org/10.1016/j.jort.2014.09.006 Edward, I. Y. M., Shalannanda, W., Lestariningati, S. I., Agusdian, A. (2015). E-government master plan design with togaf framework. In Proceedings of 2014 8th International Conference on Telecommunication Systems Services and Applications, TSSA 2014. https://doi.org/10.1109/TSSA.2014.7065957 EMA. (2015). EudraVigilance stakeholder change management plan. EMA/797114/2014, 44(October), 42. Hashim, M. (2013). Change Management. International Journal of Academic Research in Business and Social Sciences, 3(7), 22226990. https://doi.org/10.6007/IJARBSS/v3-i7/92 Hornstein, H. A. (2015). The integration of project management and organizational change management is now a necessity. International Journal of Project Management, 33(2), 291298. https://doi.org/10.1016/j.ijproman.2014.08.005 Kansal, S., Chandani, A. (2014). Effective Management of Change During Merger and Acquisition. Procedia Economics and Finance, 11, 208217. https://doi.org/10.1016/S2212-5671(14)00189-0 Keenan, R. J. (2015). Climate change impacts and adaptation in forest management: a review. Annals of Forest Science. https://doi.org/10.1007/s13595-014-0446-5 Levin, G. (2014). HBRs 10 Must Reads On Change Management. Project Management Journal, 45(3), e1e1. https://doi.org/10.1002/pmj.21413 Lillie, E., Sandborn, P., Humphrey, D. (2015). Assessing the value of a lead-free solder control plan using cost-based FMEA. Microelectronics Reliability, 55(6), 969979. https://doi.org/10.1016/j.microrel.2015.02.022 Lines, B. C., Sullivan, K. T., Smithwick, J. B., Mischung, J. (2015). Overcoming resistance to change in engineering and construction: Change management factors for owner organizations. International Journal of Project Management, 33(5), 11701179. https://doi.org/10.1016/j.ijproman.2015.01.008 Mangundjaya, W. L. H., Utoyo, D. B., Wulandari, P. (2015). The Role of Leadership and Employees Condition on Reaction to Organizational Change. Procedia - Social and Behavioral Sciences, 172, 471478. https://doi.org/10.1016/j.sbspro.2015.01.385 Michener, W. K. (2015). Ten Simple Rules for Creating a Good Data Management Plan. PLoS Computational Biology, 11(10). https://doi.org/10.1371/journal.pcbi.1004525 Piscopo, M. (2015). Risk Management Plan. Project Management Docs, p. 17. https://doi.org/10.2172/791347 Public Health England NHS. (2015). Heatwave plan for England. Retrieved from https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/429572/Heatwave_plan_-Making_the_case_-_2015.pdf Santamouris, M., Cartalis, C., Synnefa, A. (2015). Local urban warming, possible impacts and a resilience plan to climate change for the historical center of Athens, Greece. Sustainable Cities and Society, 19, 281291. https://doi.org/10.1016/j.scs.2015.02.001 Thgersen, T., Hoff, A., Frost, H. S. (2015). Fisheries management responses to climate change in the Baltic Sea. Climate Risk Management, 10, 5162. https://doi.org/10.1016/j.crm.2015.09.001 Tkaczyk, B. (2015). A Playbook for Positive Organizational Change: Energize, Redesign, and Gel. Strategic Change, 24(6), 527540. https://doi.org/10.1002/jsc.2041 Vaccarezza, B. A., Rizzi, G. (2014). Change Management Dashboard : An Adaptive Approach to Lead a Change Program. People Strategy, 37(1), 4650.
Subscribe to:
Posts (Atom)